Education
Heritage High School
What We Did
Voice Cables
Data Cables
Telecommunication Rooms
The Result
The project involved installing three hundred and forty-one (341) voice cables, one thousand four hundred and ninety (1490) data cables, cabling to thirty (30) wireless access points, one hundred thirteen (113) camera locations, two (2) fire alarm locations, two (2) security locations, and two (2) cables for the elevator. Nine (9) telecommunication rooms were also built-out and fiber optic cabling was installed to connect the eight (8) IDF’s to the MDF.